Define the application
A replacement project starts with the existing drawing or sample reference. Review mating features, wear-prone areas, quantity per assembly and required inspection points before confirming supply.
What to share
- Equipment interfaces and process conditions.
- Controlled drawing or sample references.
- Material grade, quantity and inspection requirements.